it was back to practicals after two days of classroom, and we had to get down quickly as there was a lot of work that needs to be done.
1st we had to install 10 spot lights around the Guest house gardens.
we had to dig a trench for the 1,5mm surfix cable which will be transfering current from one spotlight to the other.we only installed six(6) spot lights.
we had to stop with our job as the material we had was not enough to do the expected job,they kept on promising us that it is on its way until knock off time.